I love having Followers, Thank You

Showing posts with label A Year of Projects. Show all posts
Showing posts with label A Year of Projects. Show all posts

Sunday, March 04, 2012

Sunday with Sandy

YOP, updated in tab above, only thing remaining untouched on list is Candy Corn Ghan, and learning to make socks. Since last week's update have added 2 finished ghans, Baby Boy Blanket in previous post (FOF).

Kaleidoscope is finished. Was pleased with the end size, given how small the squares were to start with, and my limited amount of black in my stash. I edge the 25 squares with 2 rows of black, joined them using the sc continuously across, then added a row of sc pink, sc black, sc green, sc black, followed by a edge scalloped row in pink. Here it is before being laundered and blocked, measures about 44 inches squares, should grow maybe a couple of inches in the process. This will be a nice blanket for a little girl up to teen in a lapghan.

A close up of the border. Another afghan that will be donated to Project, "Welcome Home", through Bridge and Beyond.

TaDAH! I'm pretty excited about this scarf. Not that it's really even something "special". But, I started it before Christmas...ran out of time, laid it aside. Totally forgot where in the pattern I was and didn't know how to figure it out. Sometime back I posted about this problem. Was debating about frogging it. A fellow knitter, ChrisKnits came to my rescue and left directions about how to figure out where I was. Got brave the other day tried it, and ....it worked. Tank you Chris! I've successfully added 4 sections! Woot woot. Love it when a plan comes together. This has been on my YOP list untouched for way too long, so despite it just being a scarf (small project compared to all the ghans), I'm excited because I'm making headway, solved the problem, and won't be frogging. QUESTION...on the increase decrease row pattern calls for k1, k1 front and back (for the increase). I'm not thrilled with the look and wonder if I do this again (do like the stripes), how different it might be to do a yo for the increase and or cast on another for the increase. Obviously the yo would create the eyelet edge look, but what about the cast on add?

**Plan for the week is to finish scarf, begin working on another ghan, thinking of removing socks from list. Realistically, I feel making the ghans for those in need is a bigger priority then making socks for myself......though I do want to learn. Not very motivated to pull out Candy Corn, since it's not the season; but........it won't be until after we finish our year...**
Badge and Link for YOP in sidebar. Join in on the fun.

Sunday, February 26, 2012

Does this Work?

Bountiful Harvest is complete, it's been laundered and here it's being blocked. Pleased with how it turned out, but....the off white keeps looking white in the pictures. It's not white white, but in reality I wished I had not used it. I wanted to extend the size of the squares without edging each one since they were all nicely edged in green. Debated at the time using a dark green I had in my stash (which isn't really a match of the that used on the squares edge...close though), and opted for the off white thinking the fact that the greens weren't the same would be too noticeable next to each other. I think, in retrospect it would have been more striking...the darker colors? Even considered the tan/brown but didn't think I had enough and so used it on the edge to pull both the orange and tan in a bit more. Still, it's a nice size and color, I believe for a family afghan for Bridge and Beyond's, project, "Welcome Home."

Had these 16 small squares(donated for Bridge and Beyond) laid it aside and thought adding pink might be cute or green or brown for a small child's afghan. Actually pulled out pink, had a good amount in my stash. But, hadn't planned on working on this as I was jazzed up about Kaleidoscope, you might have seen recently. However, got a request for a baby blanket, for a boy from Rae. Rae, is one of the ladies who helps me deliver items to the various homeless groups. She delivers directly to those living on the streets (under the bridge), as she gives them hot meals on Saturday mornings. She asked if we might have something appropriate for a couple who's expecting. Can you imagine being homeless? Even with all the charity work I do, I truly can't. Can you imagine being pregnant and living outdoors in the cold, wherever you can? Beyond my capibility to fathom how that must feel. I thought of these squares I had layed aside and immediately went to work.

Found various browns and tans in my stash and started edging, using the lightest tan for what will be the joining color. I didn't have enough to make 4 squares of each combination, so am mixing it up a bit. Layed out the browns on the small squares and asked hubby if the browns mimimized the pink and made it look boyish? He said he didn't see any pink, and wouldn't have thought pink, if I hadn't pointed it out to him. So, this is how far I am. Does this work? Only have 4 squares to finish edging before starting the joining which I should be able to finish today. Then plan to do border with some dark brown and chocolate brown (if there's enough) you see in the squares. It doesn't look girlish to me, and it's certainly the not traditional soft baby blue........but I want something they can use a bit longer...something larger, and heavier then a baby weight blanket. Does this work for this purpose? Love your thoughts. If not, it won't go to waste...it will be donated to project, "Welcome Home", for a toddler and I'll figure out something else for this soon to be born baby. I just felt the need to move on this pronto!

YOP Plan:
Since last Sunday, I finished Bountiful Harvest...obviously. My plan was to work on the Buckeye Slant Scarf that's been on the list, needless to say...that didn't happen, as I focused all my attention on the ghans. Perhaps in the coming week. YOP list on tab at the top of my blog, and YOP badge and link in the sidebar.

Happy stitching this week one and all. Stay safe, stay warm, and please give me your input on the Baby Blanket...believe I'll just name this one Baby Boy Bridge Blanket.

Sunday, February 19, 2012

Yippee Skippee, I have lots to share on Sunday

Mother Earth Done, literally just finished the border last night before bed. Still have a few tails to weave in, launder and block and then this baby will be donated to Bridge and Beyond for Project "Welcome Home. Very happy with the way the colors played out here, even though once I started joining it, I had to make a few adjustments from the original design.
Crocheted Camo scarf, now finished and has already been donated to Bridge and Beyond, my charity (hop over to the blog and check it out). In fact, this has already been delivered, as I made 2 large donations this past week.
A red and black chunky scarf in the works, on the needles as we speak. This is the 4th scarf I've made/worked on that wasn't ever on "the list".

Since last weeks, YOP post, I've completed The Cotton Cloth Calendar Challenge and it's pictured a few days ago, HERE, on Finished Object Friday. I finished Mother Earth, and I've almost figured out where I left off on the scarf on the WIP list, Diagonal Buckeye, and plan to work on it this week; as I decide which afghan to work on next. The afghan list never ends. Feels good though to move a few more items to the done list. My updated YOP list is found in the tab across the top of the blog.

Badge, and link for YOP in the sidebar, please join in on the fun.

Sunday, January 22, 2012

Building Red Brick

first designI assemble (build) afghans from donated squares through my charity blog, Bridge and Beyond. One of two things happens as the squares come in. Depending on what I'm working on and how many squares I have on hand...I either design a ghan with the squares, label and bag it for future assembling, OR the squares go into my square collection area. Then periodically I dump sort and design those squares in the collection area. Such was the case here. This group of red and brown squares (lots of sizes), were bagged and labeled as I worked on other afghans. I always take pictures so I remember how I had it layed out.

adding new squaresReviewed the above, measured it and thought it a bit small, and if I added lots of edging rows thought it wouldn't quite be what I wanted. So, looked through my squares collection area...after all, since the original design in picture 1, other squares had come in. I added about a dozen squares and felt this would work be an appropriate size.

edging and joiningUnlike real bricks and mortar knitted and crocheted squares can be moved around. Since there were sooooooo many different sizes here of both squares and rectangles, things needed to be moved to better fit. A real work in progress. Hoping to have this finished in short order. After it's all pieced together, I'll edge with several rows of red, then some brown...at least that's my current plan. I enjoy how funky and different these ghans come out when made from lots of different squares, but they do require extra work to get them together....much like a puzzle.

Since last week's YOP blog post, Got Brown Afghan has been completed, as has the shades of gray scarf. Both were pictured on Finished Object Friday's Post Here. Additionally, I've started working on the Feb cloth for Cotton Cloth Calendar Challenge; but....need to frog it, or at least part of it.

Saturday, January 14, 2012

Snowy Sunday

This scarf wasn't on my YOP list (see tab above) , however...it might be the replacement scarf for Liberty Lace. I just haven't been able to my way clear to restart that. It's been frogged and is now on the back burner. This scarf is gray, though looks a bit blueish in the picture. Nothing fancy; but I'm really enjoying it, both in appearance and because it's so straight forward. Nothing but good old garter stitch, with the shading in the yarn, I don't believe you need anything else. This is being knit on size 10 needles with Marble Chunky yarn. The yarn has a wonderful feel, is 100% acrylic and therefore washable. It doesn't feel like acyrlic, it's light to touch and is a pleasure to knit with. When I started this, I thought it might be mine......since Liberty Lace was a failure...but, it's nice and warm and large enough, might work well for Bridge and Beyond. Jury's out until it's finished where it will end up.
This lovely green lace scarf moves from a WIP to a FO and is for my DD. Made with Cascade Yarns, Lana Bambu (79& wool and 21% Bamboo) on size 9 needles. I LOVE this yarn and plan to gt more. It has some a fabulous feel, a neat texture to it with good body.
Got Brown is coming along nicely! It should be finished soon and will be donated to Bridge and Beyond for Project Welcome Home.

So, rather then redo the list each time for YOP, I'll make the changes above, you can also click the tab to see the whole list.

Plan for the week with regard to the list, start the February cloth for the Cotton Cloth Calendar Challenge, only 2 more to go, February and March.

Tuesday, January 03, 2012

Taking Stock of the List

10 of 25 squares edged with 2 rows of black. Squares now 12 inches. Details below regarding "Got Brown" Afghan in Works in Progress.
Good headway on Darling Daughters Green Lace Scarf. Love this yarn, love the pattern. Details below in Work in Progress.

On July 10th, 2011 I joined a blog hop on Ravelry called a Year of Projects (YOP)

My list has been broken into 3 categories:
Goals, Work in Progress, and Finished Objects. The list has been alter slightly. 2011 has come to and end, and today is day 3 of year 2012. The half way point in the YOP.

Goals:
1. Learn to knit cables
2. Learn to knit socks
**I've made a cable knit washcloth so have accomplished 50% of this list item. I also have a cable knitted skirt I'm thinking of making...but, don't plan to add that item to the list

WIP:
1. Candy Corn Ghan has been on this list Forever, and hasn't been touched. Seems since we past fall, it won't be for some time to come.
2. Liberty Lace. A scarf I'm making for myself. A challenge as it was a new lace stitch, my first. The yarn is yummy from a feel standpoint. Liking the color less and less as time goes on. On the back burner...haven't worked on it since ( ), a contender for frogging.
3. Buckeye Diagonal Scarf...also on the list a long time, no progess made. Back burner as OSU football season is a way off now, what's the point from a time management standpoint. Last worked on (May of 2011 )
4. Cotton Cloth Calendar Challenge. Fabulous headway here. 10 of 12 months completed 83% Done! Months pending are February and March. Cotton on hand, need to pick out pattern for February in the next couple of weeks.
5. Awesome Blue Scarf...frogged after 3 attempts and removed from list. Rather Replaced with Darling Daughters Green Scarf. Lots of headway, hoping to finish this week and mail to her. Had hoped to finish by Christmas, but that didn't happen. Pictured above and is one of my current focuses.
6. Bridge and Beyond Afghan, Got Brown? This particular item is coming along nicely, however since making ghans for Bridge and Beyond is ongoing...it's never going to be considered Done on my list. Pictured above in the works, and is one of my current focuses.

Finished Objects:
1. Wedding Ghan, this was the first fully knitted ghan with all new stitches I've made. It was a challenge, and I was very pleased with the end result.
2. Odd Ball Baby Blankets. When this was added to the list it was going to be 1 blanket, or my part of the one blanket. Turned into my part of 4 blankets. Cinco De Mayo, Baby Pink Petuna, Mardi Gras, and Fruit Salad. My parts are all DONE
3. Red Scarf No More, due to yarn problems this scarf was not donated to The Red Scarf Project, instead it was donated to Bridge and Beyond.
4. Bridge and Beyond Afghans. As stated above this is is always on going. I assemble ghans from donated squares which are in turn donated to Homeless Families through Bridge and Beyond. From the time YOP began here's the completed list:
A. Pink Poddle
B. Jewels
C. Pink Petuna
D. Rainbow Bright
E. Royalty

Badge and link for YOP in sidebar

Sunday, December 18, 2011

What are the Right Tools?

This is the start to The January Cloth for Cotton Cloth Calendar Challenge for my DD. Sigh.........The photo shows 2 cables and the pattern is called mirror image. The beginning you see is after 3 tries! Argh..........it's been frogged multiple times. First it was going to be blue and white......white for snow and blue for cold. Cold and snow pretty much sums up Ohio in January. However, after frogging twice I decided to stick with one solid color, one less issue to deal with. This is my first attempt at cables. Learning to knit cables is one of 2 items on the goal area of My Year of Projects List.

I thought (probably not wisely so), that doing a cotton washcloth would be a good way to try my hand at this stitch, because it's a small project and doing something new on a small project is probably a better idea.....right? Hum, well in retrospeak, I think using cotton for a cable is probably NOT a good idea? Cotton has next to know give, no flexibility which seems to make doing the stitch really hard on my hands......tight. I do a few rows, then take a break.
I read the directions several times, and watched a couple of video's to see how to do the stitch. Above you see 2 types of cable stitch holders. The one that looks like a knitting needle with a curve is the one I started with. My thought was, it's about the same size (gauge) as the knitting needles I'm using for the project..........figured that would keep the stitches the right gauge?
Some directions suggest knitting right from the stitch holder..........yeah, tried that and couldn't keep the count very well. Though it did seem knitting from the holder when the holder was in back of the work (C6B) was easier then C6F. Another video suggested moving the stitches back to the regular knitting needle. That method seemed to work better for me.........except I found again moving them hard to keep the right number, things just seemed toooooooooooo tight, particular with C6F.

Then I remembered the cable holders I purchased previously that looked like big safety pins and thought I'd give those a try. I much prefer these. Using these and putting the stitches back on the needle seems to be easier....not easy, but easier. One of the video's showed a v shape stitch holder that I've not seen in the stores. Need to keep my eyes open, as it seemed like it might be the ticket.

Does the equipment/tools one uses make a difference? As a newbie, I think so...but what say you all? Is using a cotton a foolish way to learn? Is a good wool easier?

YOP link and badge in sidebar. Working on the actual list, plan to have an additional page/tab here vs reposting it each Sunday.

Sunday, December 04, 2011

Chipping away at My List of Projects, it's Sunday

Naming this Royalty. I think the purple and gold make it look royal. I think these colors work for men or women and will make a nice family ghan when completed. This is another of the many ghans for Project Welcome Home through Bridge and Beyond. All these squares were donated, I'm edging them in a very dark green and will join them in the same dark green and add a border. Once laundered and blocked it will be donated.
YOP Dec 4-10th

Here's the 8th of 12 cotton cloths for my cotton cloth calendar challenge for my Darling Daughter. This is November's cloth for my Cotton Cloth Calendar Challenge. I've already cast on December's, might have enough to show you a picture in a few days. Those left to do are: January, February, and March. Would be nice if I got them all done and could give them to her when I see her over Christmas....but I doubt that's going to happen. Too many other things going on.

Please folks, save time and eye strain, get rid of your captcha. The blogger filter works very well. I just checked my spam folder and deleted 52 comments that did not make it through to the blog. You do not need the captcha. You really don't need it plus moderating comments. Save frustration, save time, save eyestrain. Change your settings. Skeptical...try it a week and you'll see what I mean. Meme's are fun, but visiting everyone is hampered by everyone using captcha's, it really slows down the process.

Things now DONE:
1. Wedding Ghan pictured HERE
2. Oddball blanket (which turned into 2 where I was the border patrol person, Cinco de Mayo and Mardi Gras). Done and Mailed Pictured HERE
then turned into 3 when I started Baby Pink Petuna, HERE...then turned into 4 counting Fruit Salad which is in the works as we speak.
3. Red Scarf No More DONE (donated to Bridge and Beyond) Pictured HERE
4. Pink Poddle Ghan DONE, and donated also to Bridge and Beyond for Project Welcome Home.
5. Jewels Ghan Done, one of an undermined list for Bridge and Beyond, made from donated squares, pictured HERE. Pink Petuna Afghan also DONE (picture Friday for FOF HERE). Donated to Bridge and Beyond. Rainbow Bright DONE pictured HERE. Currently working on Royalty, pictured above.

WIP:
1. Cotton Cloth Calendar Challenge (8 of 12 cloths done, November Cloth pictured above.
3. Awesome Blue Scarf gave up trying to determine what pattern I had been using, and FROGGED! ........ARGH. Officially DELETING this from the list, and replaced it with the green scarf I'm working on for DD pictured HERE.
4. Buckeye Diagonal Scarf, have found the directions to help me determine where I left off, fingers cross this works. Have been in a holding pattern as I couldn't determine where I left off. Thanks to a blogger's good directions of how to determine, am hopeful! ??45% done
5. Candy Corn Ghan (my longest running work in progress ever 60% done) STILL haven't touched it in months.......sigh
6. Working on Liberty Lace for myself (put way way on the back burner), last pictured HERE

Goals:
Learning to knit cables (watched a video awhile back which is helping me feel more confidant and willing to give it a try)---think I've found an easy one to start with and might use it for January's cloth in the calendar challenge...might be a nice way to ease into making a cable!
Learning to knit socks

**I have HAP ghans to pick up and assemble....sometime.**

Sunday, November 27, 2011

Sunday...really, too close to the end of Year (YOP)

YOP Nov 27-Dec 3, 2011

Pink Petuna (not the same as one titled that below for The Oddballs Group). This ghan was started from squares donated by a former classmate through Bridge and Beyond. It will be donated for Project Welcome Home. Making great headway here so hope to have this done soon. This was not officially listed on my YOP list, as there's not a definitive list for the ghans I assemble for Bridge and Beyond....I just make one after another and hope for lots.
This scarf was started a while back and has been put on the back burner. It's a scarf I started for myself. I frogged it twice as I didn't like the pattern I had chosen. I do like this, a bit lacy, but since this is 100% wool (Liberty wool), it will still be warm. Interesting? mix of colors. Not what I had thought it would be when I purchased the yarn. The remainder of this first ball is pretty much what I saw when I purchased it. Therefore, I expected it to be mostly reddish and gray, shades there off. It's far from that as you can see. Not colors I would have put together, bit disappointing, but eventually...........I'll get back to it. I do need a new scarf. This was barely started when posted for a wipw HERE.
LOVE this green scarf started for DD. Not on the list, but saw the green yarn and it called out to me. Same stitch as the above scarf I'm making for myself. Look how different though it looks. I assume that's because of the shading and the fact that this yarn is a heavier gauge. I LOVE the feel of this yarn also. It's Cascade Lana Bamboo 79% wool and 21% Bamboo and comes in a 196 yard skein. I have 2 skeins, and am using a size 8 needle. The pattern, multiple of 3 Knit 1, YO K2tog. To give it a bit more stability I'm doing 5-6 rows of straight garter stitch every 16 or so rows.
This is Fruit Salad....another OddBall Blanket. I really thought I had finished all the ones I had signed up for, apparently I forgot how many I committed too. Though this is, I think the last for this year. I thought I had just the 2 when I made my YOP list Cinco deMayo and Mardi Gras; then added starting one...Baby Pink Petuna, and now a section here on fruit salad. I'm to be blueberries, so need to look for some blue yarn in my stash to fill the bill.

Please folks, save time and eye strain, get rid of your captcha. The blogger filter works very well. I just checked my spam folder and deleted 52 comments that did not make it through to the blog. You do not need the captcha. You really don't need it plus moderating comments. Save frustration, save time, save eyestrain. Change your settings. Skeptical...try it a week and you'll see what I mean. Meme's are fun, but visiting everyone is hampered by everyone using captcha's, it really slows down the process.

Things now DONE:
1. Wedding Ghan pictured HERE
2. Oddball blanket (which turned into 2 where I was the border patrol person, Cinco de Mayo and Mardi Gras). Done and Mailed Pictured HERE
then turned into 3 when I started Baby Pink Petuna, HERE...then turned into 4 counting above Fruit Salad.
3. Red Scarf No More DONE (donated to Bridge and Beyond) Pictured HERE
4. Pink Poddle Ghan DONE, since my last post and donated also to Bridge and Beyond for Project Welcome Home.
5. Jewels Ghan Done, one of an undermined list for Bridge and Beyond, made from donated squares, pictured HERE.

WIP:
1. Cotton Cloth Calendar Challenge (7 of 12 cloths done, and picked out the pattern for November and have started it....barely, so about 68% done).
3. Awesome Blue Scarf gave up trying to determine what pattern I had been using, and FROGGED! Will once again find a pattern I want to use, leave it with the awesome blue and start again, which will be about the 4th time........ARGH. Officially DELETING this from the list, and will replace it with the above green scarf for DD....that seems appropriate.
4. Buckeye Diagonal Scarf, have found the directions to help me determine where I left off, fingers cross this works. Have been in a holding pattern as I couldn't determine where I left off. Thanks to a blogger's good directions of how to determine, am hopeful! ??45% done
5. Candy Corn Ghan (my longest running work in progress ever 60% done)
6. Afghans to be assembled for Bridge and Beyond from donated squares (have several designed and ready to edge, shifting to this as primary goal now that Pink Poodle is complete. Edged and assembled RainBow Bright, pictured HERE for FOF. Jewels done above, and currently working on Pink Petuna, above.

Goals:
Learning to knit cables (watched a video awhile back which is helping me feel more confidant and willing to give it a try)
Learning to knit socks

**I have HAP ghans to pick up and assemble....sometime.**

Sunday, October 23, 2011

It's Sunday, Already!

Please folks, save time and eye strain, get rid of your captcha. The blogger filter works very well. I just checked my spam folder and deleted 45 comments that did not make it through to the blog. You do not need the captcha. You really don't need it plus moderating comments. Save frustration, save time, save eyestrain. Change your settings. Skeptical...try it a week and you'll see what I mean. Meme's are fun, but visiting everyone is hampered by everyone using captcha's.

*****see notations on #6 in Work in Progress are for above picture*****
YOP Oct 23-29th (link in sidebar)
Have missed several YOP post, trying to catch up and hoping things get back to normal, whatever that is.

Things now DONE:
1. Wedding Ghan pictured HERE
2. Oddball blanket (which turned into 2 where I was the border patrol person, Cinco de Mayo and Mardi Gras). Done and Mailed Pictured HERE
3. Red Scarf No More DONE (donated to Bridge and Beyond) Pictured HERE
4. Pink Poddle Ghan DONE, since my last post and donated also to Bridge and Beyond for Project Welcome Home.

WIP:
1. Cotton Cloth Calendar Challenge (7 of 12 cloths done, and picked out the pattern for November, so about 68% done). October Cloth pictured HERE.
3. Awesome Blue Scarf gave up trying to determine what pattern I had been using, and FROGGED! Will once again find a pattern I want to use, leave it with the awesome blue and start again, which will be about the 4th time........ARGH
4. Buckeye Diagonal Scarf, have found the directions to help me determine where I left off, fingers cross this works. Have been in a holding pattern as I couldn't determine where I left off. Thanks to a blogger's good directions of how to determine, am hopeful! ??45% done
5. Candy Corn Ghan (my longest running work in progress ever 60% done)
6. Afghans to be assembled for Bridge and Beyond from donated squares (have several designed and ready to edge, shifting to this as primary goal now that Pink Poodle is complete. Edged and assembled RainBow Bright, pictured HERE for FOF, and am working on Jewels, previously named Pastel Jewels pictured previously on WIPW HERE.

Goals:
Learning to knit cables (watched a video awhile back which is helping me feel more confidant and willing to give it a try)
Learning to knit socks

Extra's:
(Things that weren't on the list)
1. Pink Petuna (the start of another Oddball Baby Blanket, my section DONE. Pink Petuna will be traveled to the next knitter.
2. Christmas Ghan (I always make at least 1 for Christmas for our family throw in present), hadn't even rememeber about that til a few days ago. Just now sure this is going to happen this year.
3. Janet Ghan (wanting to make a ghan for my niece in NY. She's from warm Texas and is not used to cold winters...but I need time. Want to do this, but....it's looking iffy at the moment.
4. Forgot I committed to assembling 5-6 ghans for HAP, probably will have to chip away on those in between all these above items.
5. Started and frogged 2 scarves this week that were projects for self. Story of my life, I start them for me, put them aside in some fashion deciding I need to focus on others.

Sunday, September 25, 2011

Pink Poodle Progress

YOP Sept 25-Oct 1 (link in sidebar)
pink poodle to datePink Poodle is progressing, slower than I would like as this yarn seems to make it go slow. I've added 4 sections from where it was last week. Had hoped to be done with this in order to show it 2 days ago for Finished Object Friday. That didn't happen. I didn't have anything to show you then. Works been busier then normal, and so has my life so.......am settling for making some pregress...........even though slower than I would like. New goal is to have this finished to show you on this coming Friday, for FOF.

The last official day of summer came and went, always hate that. Got lots of follow up done with my 90+ year old aunt who's now here in town in a rehab center. Next up I fear will be getting her placed in a long term care facility. Sad to see someone deteriorate. Whomever called old age the golden years, clearly didn't know what they were talking about.

Hoping to finish some mulching today, when it dries out and would like to get lots of knitting done. Happy Sunday all.

When finished this ghan will be donated to Bridge and Beyond for the "Operation Welcome Home". Believe it will be a nice size for a young girl and or adult female as a lap wrap.

Things now DONE:
1. Wedding Ghan pictured HERE2. Oddball blanket (which turned into 2 where I was the border patrol person, Cinco de Mayo and Mardi Gras). Done and Mailed Pictured HERE3. Red Scarf No More DONE (still deciding where this should go) Pictured HERE
WIP:
1. Pink Poodle Ghan (75% done) Managed to do 4 more sections
2. Cotton Cloth Calendar Challenge (6 of 12 cloths done, and most of cloth 7 done, so 65% done)
3. Awesome Blue Scarf gave up trying to determine what pattern I had been using, and FROGGED! Will once again find a pattern I want to use, leave it with the awesome blue and start again, which will be about the 4th time........ARGH
4. Buckeye Diagonal Scarf, have found the directions to help me determine where I left off, fingers cross this works. Have been in a holding pattern as I couldn't determine where I left off. Thanks to a blogger's good directions of how to determine, am hopeful! ??45% done
5. Candy Corn Ghan (my longest running work in progress ever 60% done)
6. Afghans to be assembled for Bridge and Beyond from donated squares (have several designed and ready to edge, shifting gears to make this a focus as soon as Pink Poodle is done)

Goals:
Learning to knit cables (watched a video awhile back which is helping me feel more confidant and willing to give it a try)
Learning to knit socks

Extra's:
(Things that weren't on the list)
Pink Petuna (the start of another Oddball Baby Blanket, my section DONE. Pink Petuna will be traveling to the next knitter as soon as sign up's are done. SHE'S STILL WAITING FOR TRAVEL PAPERS!
Christmas Ghan (I always make at least 1 for Christmas for our family throw in present), hadn't even rememeber about that til a few days ago.
Janet Ghan (wanting to make a ghan for my niece in NY. She's from warm Texas and is not used to cold winters...but I need time

Sunday, September 18, 2011

Sandy's Sunday Year of Projects, fast week

Sept 18-24th YOP
Candy Corn GhanCandy Corn Ghan, my longest WIP project, EVER...must pull it out of the bag and get working on it again, after all tis the right season....AGAIN
Pink Petuna OddBall Baby BlanketPink Petuna, bags packed waiting to travel, she's just not sure where she'll be traveling yet.
Pink Poodle GhanPink Poodle Ghan


Another Sunday rolls around and finds me once again reviewing my list for Year of Projects.

Things now DONE:
1. Wedding Ghan pictured HERE2. Oddball blanket (which turned into 2 where I was the border patrol person, Cinco de Mayo and Mardi Gras). Done and Mailed Pictured HERE3. Red Scarf No More DONE (still deciding where this should go) Pictured HERE
WIP:
1. Pink Poodle Ghan (60% done) Managed to do about 10 rows yesterday, so almost another section done
2. Cotton Cloth Calendar Challenge (6 of 12 cloths done, and most of cloth 7 done, so 65% done)
3. Awesome Blue Scarf gave up trying to determine what pattern I had been using, and FROGGED! Will once again find a pattern I want to use, leave it with the awesome blue and start again, which will be about the 4th time........ARGH
4. Buckeye Diagonal Scarf, have found the directions to help me determine where I left off, fingers cross this works. Have been in a holding pattern as I couldn't determine where I left off. Thanks to a blogger's good directions of how to determine, am hopeful! ??45% done
5. Candy Corn Ghan (my longest running work in progress ever 60% done)
6. Afghans to be assembled for Bridge and Beyond from donated squares (have several designed and ready to edge, shifting gears to make this a focus as soon as Pink Poodle is done)

Goals:
Learning to knit cables (watched a video awhile back which is helping me feel more confidant and willing to give it a try)
Learning to knit socks

Extra's:
(Things that weren't on the list)
Pink Petuna (the start of another Oddball Baby Blanket, my section DONE. Pink Petuna will be traveling to the next knitter as soon as sign up's are done
Christmas Ghan (I always make at least 1 for Christmas for our family throw in present), hadn't even rememeber about that til a few days ago.
Janet Ghan (wanting to make a ghan for my niece in NY. She's from warm Texas and is not used to cold winters...but I need time

Sunday, September 04, 2011

Drum Roll Please, Wedding Ghan(YOP)

Post #7 YOP (Sept 4-10th)

Wedding Ghan before blockingJust finished the border, have a few tails to tuck, launder and block and it's finished! The Wedding Ghan. I'm happy with the end result, pleased with what I learned in the process. This was my first knitted ghan with multiple stitches, first large scale knitting project, and first large scale project joining with the very tedious mattress stitch. I learned to do eyelet knitting and enjoyed stitch variety I got with the blocks (taupe blocks), and the texture and zigzag triangles (dark brown blocks) I got with counting, counting, counting. Lost track how many times I ripped out and redid. The brown blocks seem to be the most difficult for me, harder to see I think. I had issues with being on the wrong side...apparently forgetting to click my row counter, or perhaps clicking it twice? Thinking I hadn't clicked it? This item is now in the wash. I'll move this item now to my completed list of YOP.
close up borderI crocheted the border with several rows (2 each of the dark brown and taupe, and 1 of the ivory inbetween) of single crochets, followed by a row of scallops in dark brown to finish it off. The border I think not only gives it a more finished look, but helps it lay more flat. Which also the blocking should help with.

In addition (no picture at this time). I finished the red-purple scarf, called Red Scarf Project no more. Tucked tails just before posting, so it too moves into the finished list.

Working on October Cloth for Cotton Cloth Calendar Challenge (which makes cloth 7), and Poddle Ghan. Also selecting border for 2nd Oddball (Cinco de Mayo). Pictures later.

YOP list:
Wedding Ghan DONE
Cotton Cloth Calendar Challenge (about 50% done with DD's cloths) started cloth 7 which was to be Easter Colors, a basket weave design for March; but you can't see the pattern well, and needles are wrong, and wrong size and ...frogged it. Posted it HERE. Think I'll switch to October since that's closer anyway. April, May, June, July, August, and September done. Need to do Jan, Feb, March, Oct, Nov and Dec. **Switched to October current focus
Cotton Cloths for Bridge and Beyond (haven't started)
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf no headway Poodle Ghan (a current focus)
Oddball (Waiting on 2nd one to arrive so when I get it finished, I can mail them at the same time.)
Bridge Ghans (no additional headway) Will begin edging squares since wedding ghan is done
Red Scarf Project Scarf, posted about it HERE. So, will now call this scarf Red Scarf Project No More. DONE

Happy Sunday all

Monday, August 29, 2011

Final Stages Wedding Ghan (YOP)

Year of Projects post #6 (Aug 28-Sept 3)

Adding edging now to the wedding ghan. All stripes sewn together, all tails tucked. Making my way around with single crochets, will do several rows, plan on using all 3 colors with the final border edge the dark brown. Then it need to be laundered and blocked. The edges are curling up more then I like, but I think with each row they're improving. Wanted to have this done a week ago, but it takes time. Each border row is over 600 stitches!

Continuing to work on red and purple scarf, Red Scarf Project no more. It's a reasonable take along project so been chipping away on it.

YOP list:
Cotton Cloth Calendar Challenge (about 50% done with DD's cloths) started cloth 7 which was to be Easter Colors, a basket weave design for March; but you can't see the pattern well, and needles are wrong, and wrong size and ...frogged it. Posted it HERE. Think I'll switch to October since that's closer anyway. April, May, June, July, August, and September done. Need to do Jan, Feb, March, Oct, Nov and Dec.
Cotton Cloths for Bridge and Beyond (haven't started)
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf (planned to take on recent trip; but as I was packing it realized I once again had not included the pattern I was using in the zip lock bag!) Why...probably because I was using the pattern on something else? I have no yet frogged this start---it's a 300 stitch cast on and I'm hoping to be able to determine what I was doing.
Poodle Ghan (had planned to finish this by now, had it packed for mentioned trip....mindless knitting would have been good; but.........needed to remove it from the suitcase to make room for our Martini glasses)
Oddball (Waiting on 2nd one to arrive so when I get it finished, I can mail them at the same time.)
Bridge Ghans (no additional headway)
Red Scarf Project Scarf, posted about it HERE. Though I'm about 85% done with it, looks like with the new regulations for The Red Scarf Project, it won't be donated there, but I will continue to work on it and it will be good for something/someone/charity wise. So, will now call this scarf Red Scarf Project No More.


Sunday, August 21, 2011

Sandy's Sunday Year of Projects, fast week

Week #5 for me Aug 21-27

A much shorter post then most of my YOP posts are, and no pictures today. Though links below to see what projects I'm talking about. I've made good headway since last Sunday (Monday when I made my post); but not 1 single item is yet to go from the YOP Work in Progress List to The Yea it's done list. Chipping away. I'm so enjoying visiting, and learning from some pretty awesome blogs with regard to this challenge.

YOP list:
Cotton Cloth Calendar Challenge (about 50% done with DD's cloths) started cloth 7 which was to be Easter Colors, a basket weave design for March; but you can't see the pattern well, and needles are wrong, and wrong size and ...frogged it. Posted it HERE. Think I'll switch to October since that's closer anyway. April, May, June, July, August, and September done. Need to do Jan, Feb, March, Oct, Nov and Dec.
Cotton Cloths for Bridge and Beyond (haven't started)
Wedding Ghan (about 90% Knitting completed! Ends all tucked in, all strips joined. Have started the border. Wanted to finish this weekend, get it in the laundry and block it; that's not going to happen. Spent to much time outside doing yard work.
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf (planned to take on recent trip; but as I was packing it realized I once again had not included the pattern I was using in the zip lock bag!) Why...probably because I was using the pattern on something else? I have no yet frogged this start---it's a 300 stitch cast on and I'm hoping to be able to determine what I was doing.
Poodle Ghan (had planned to finish this by now, had it packed for mentioned trip....mindless knitting would have been good; but.........needed to remove it from the suitcase to make room for our Martini glasses)
Oddball (Two rows of the border done, so bout 60% finished, waiting on a 2nd one to be delivered so I can mail them at the same time.)
Bridge Ghans (no additional headway)
Red Scarf Project Scarf, posted about it HERE. Though I'm about 65% done with it, looks like with the new regulations for The Red Scarf Project, it won't be donated there, but I will continue to work on it and it will be good for something/someone/charity wise.

Monday, August 08, 2011

Running to Catch Up

YOP wk 4 for me (Aug 7-13)

Some progress to report on my YOP list:
Got July finished, and both April and September started for my Cotton Cloth Calendar Challenge. I was traveling (Park City, Utah), so washcloths projects were perfect for the plane trip.

April Showers Cotton ClothThis is a neat pattern, one you might remember from the medium tan blocks in my stripes for the upcoming wedding ghan. It's called little blocks.

July clothApril showers is a cool stitch pattern, one I plan to use again perhaps on a scarf. It's called Chinese Waves. It's working up fast since it's basic garter, is nice and I think a very adaptable pattern. It called for a cast on of 45, but I thought that was too large for a washcloth and cast on 35, trick is to have an odd number for the cast on according to Margaret Radcliffe, designer. Was thrilled to come across this pattern, as I have now started and frogged this green--April Showers Cloth 3 times.....argh, just really didn't like the look of the other patterns I tried.

September, fading summer clothFading summer is sort of an eyelet pattern but with garter and purl stitches, called Reversible Open Rib Washcloth. The pattern called for a cast on of 31. I really like the look of this stitch and plan to use it again also. The nice bonus in making these cotton cloths is trying out new stitches.

Also on the plane finished 2 more blocks on the wedding ghan's last stripe (which were blocks 4 and 5), and was almost finished with the 6th and final block of the last strip when I realized there was a mistake. Somehow I had gotten off with right and wrong side. I either didn't count a row, or I hit my clicker (row counter) twice. Arghhhhhhhhh. Dark brown to hard to see to rip out and get back on track on the plane so laid it aside. Once we reached Park City and got settled in, I again re-did the brown section....And...dang it, the same thing happened. I do find it hard to see, and was apparently not paying enough attention so completely frogged it again. As of the writing of this post, I've restarted this last brown block 3 times. I didn't attempt to do it on the plane ride home and plan to finish it today and begin attaching. Fingers crossed. Taking it slowly to be certain I don't get off again. Only doing it when there are no distractions.

Have updated my YOP list when I realized I'd left something off. I started a scarf for The Red Scarf Project way back and didn't get it on the list. Actually that link shows were I made progress, as it was started before that. However...........I didn't keep the pattern I was using with it, don't remember it, and have no clue where in the process I was. So, though I took it with me for this trip to Park City, I ended up frogging it and starting over.

Red Scarf ProjectI started out with the idea of using the Reversible Open Rib Washcloth pattern, but once I did several repeats decided it was too open for a scarf. Click to enlarge. I think with this wonderful soft Plymouth Yarn (washable wool), the openness is greater than with the cotton in above washcloth? So, after doing several repeats decided to do a section of garter stitch (32 rows which is double the amount of rows 16 used in the pattern stitch), then back to the pattern though only did 1 repeat and was going to repeat that. Changed my mind again and kept going with garter. The little bit of pattern, I think just gives some detail to the scarf. Now my problem is whether or not I have enough yarn. The skein is 200 yards, and this scarf is wider then I sometimes make them. I'll dig out my scale and weigh how much yarn I have left. If there's not enough, will have to get creative with how I finish it, as I've had this yarn a long time and won't even attempt to match it.

YOP list:
Cotton Cloth Calendar Challenge (about 40% done with DD's cloths)
Cotton Cloths for Bridge and Beyond (haven't started)
Wedding Ghan (about 80% done, need to finish last block, attach last strip, edge, launder and block)
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf (planned to take on recent trip; but as I was packing it realized I once again had not included the pattern I was using in the zip lock bag!) Why...probably because I was using the pattern on something else? I have no yet frogged this start---it's a 300 stitch cast on and I'm hoping to be able to determine what I was doing.
Poodle Ghan (had planned to finish this by now, had it packed for mentioned trip....mindless knitting would have been good; but.........needed to remove it from the suitcase to make room for our Martini glasses)
Oddball (sorry to report no headway since picking out colors and edging pattern)
Bridge Ghans (no additional headway)

Sunday, July 24, 2011

Knitting up a Storm (Wedding Ghan, Cotton Cloths YOP))

Week #3 for me

wedding ghanHere's the wedding ghan progress, got 4 stripes (4 of 5) done, joined, AND ends tucked in...not final edge as those will get done when the ghan is bordered; but forced myself to tuck in all the ends from changing yarn colors etc so I wouldn't have them all staring at me in need of attention all at the same time.

knitted wedding ghan2 blocks of the 5th strip done, working on the 3rd block (3 of 6), hoping to have this done and joined yet this week, but may not make it given my work schedule and the fact I'll be out of town later in the week.

knitted cotton washclothsYou've perhaps seen these cloths when they were work in progress, and or separately for a finished object on a Friday post, but here now are 3 which means this project is 1/4th done. May, June and August here in this picture for my Cotton Cloth Calendar Challenge. July has been started and is about 1/3 done.

The remainder of the list:
Oddball
Blue Scarf
Edging and joining ghans for Bridge and Beyond
Poodle Ghan
Candy Corn Ghan
Buckeye Scarf
*Learn to knit socks
*Learn to knit a cable
have no progress.

In my previous post I added a fun video, please treat yourself and scroll down.

Hope you've noticed my blog log for those who visit, and comment that are part of the yop. I like to keep working blog logs, and have removed a few folks from my regular blog log who never return visits, don't blog anymore etc.

Sunday, July 17, 2011

Year Long Challenge, Week #2

It all began HERE. A post about the challenge itself and my working list.

I had a decent cotton stash that needed to be turned into cotton washcloths for my DD and for my homeless in need through my charity, Bridge and Beyond. I got the idea of a cloth to represent each month, after I purchased the above stash. Not good, as much of above stash doesn't lend itself that way. I've mention Cotton Challenge, then Calendar Cloth, and have now "officially" named this part of my list as Cotton Cloth Calendar Challenge. Part 1 of this challenge is the monthly cloth for my DD, (June is Done, August on the needlesAug cotton washclothand yesterday while out I picked up an additional color suitable to mix with something from the stash for October. So 1 down and 11 to go. All those made beyond DD's will go to The Bridge and Beyond. Though I still need more manly colors.

No work on Candy Corn Ghan, Buckeye Scarf, Awesome Blue Wool Scarf, Poddle Ghan, or Give a Square Ghans (listing still forthcoming on Give a Square Ghans).

I've continued to work on wedding ghan, working on 4th strip currently and tucked some ends in on the 3 stripes already joined.

Made selection of yarn for border patrol for The Oddball Blanket, this one titled Mardi Gras.
Will be using a bright pink variegated for a row or two, followed by a solid pink which to me is the color you first see...it's almost in the middle of the ghan, probably will make the final edge a dark purple, but that remains to be seen. The staring stage is complete. Next will select the border and hope to start crocheting on it this week.

**edited to to add this after several comments, these aren't dishcloths, these are washcloths for people to use on their bodies, larger then I would make it I were making them for doing dishes. When we make them for homeless and those in shelters it's a wonderful comfort for them to get a shower or bath with a special made washcloth. I'm making both some for the charity (Bridge and Beyond mentioned above) and some for my daughter. Using what I have in the stash, so cloths are not being made in chronological order.**

Sunday, July 10, 2011

A Year Long Challenge

Just saw this blog badge while I was making my blog rounds, followed it's link to a group on RAV, so I could see what it was all about. It's purpose, as I understand it is to challenge yourself with a list of things you want to make throughout the year. It officially started on July 1st, so I'm already behind and runs through the end of June of next year 2012. The list can be things you want to make, specific patterns etc. It's a way to encourage each other, and meet new blogging friends. I love blogging, visiting reading and commenting and this is a way to encourage that.

I tend not to have a list of things I want to make, apparently lots of folks do. I find yarn I like and that prompts me. If you've been to my blog before you probably know most of my knitting and or crocheting is for charity. I have a personal blog, Bridge and Beyond dedicated to that purpose, helping the homeless. However, I do still think I can put together a working list. I suspect though my list may change as time goes on; while the others may not?

Cotton Challenge, this cotton stash needs to be turned into Cotton Wash Cloths. My DD asked for lots (in my mind I thought about a cloth a month, seasonal, but in my stash I don't think I have every month well represented, so probably need more), AND wash cloths for my charity Bridge and Beyond. I need some more male colors also, which I didn't find in my last shopping venture.

Wedding Ghan, I've been working on this for a while certainly getting it finished (my first multi-stitch knitted ghan) is a big challenge for me. Getting it done on time is an additional knitting challenge for me. I don't knit nearly as fast as I crochet.

Longest ever work in progress. I need and want to finish this Candy Corn Ghan. I'm not sure how long ago I started it...but well before the post (it was sometime in 2008) Here. It was initially started for Victory Camp Junction, and when finished might still go there; then again I didn't have own charity when I started it; so it might go to Bridge and Beyond. Depends how many have been donated by the time I get it finished.

This Buckeye Scarf was started last Christmas, never finished and I lost my spot in the pattern. Someone told me how to figure out where I was, (hope I can find her helpful advice). So this needs to be finished. Christmas will be here again, maybe it will be a gift this year round?

I want to learn how to knit socks, so am adding a pair of socks for myself to the challenge list.

I want to learn how to knit a cable, so adding that too my list also. Whether it will end up in a hat, or a scarf I've not decided. The challenge is to learn how to do it.

I started an awesome wool scarf (barely), with a rather tedious pattern (it's been frogged 3 times), while vacationing several months ago. I want to get comfortable with the pattern and get the scarf finished in time for fall. This is a selfish goal...I want this scarf, the blue is WOW. And because it's been frogged so many times, you can see I now have markers every...I think 10 stitches. I kept loosing my count with the tedious pattern.

Need to finish this corner to corner knitted ghan, believe it will go to Missouri, Joplin for the Tornado victims. Titled Poodle Ghan

I'm in a group called Oddball Baby Blankets and am currently committed to two more. I've done many others, but haven't added anymore on, so...when it's my turn on these blankets, my challenge is to get my section and or Border done in the allotted amount of time, which is 2 wks. I currently have one needing a border, titled Mardi Gras. Haven't yet photographed it to link up here. Will add it.

With my charity, Bridge and Beyond I assemble afghans from donated squares and currently have a list of those I've designed (many others already donated), needing edges and joining. Challenging myself to get them done by Christmas. I don't know how many I have designed and bagged at the ready. Need to count and list them here.

Designing challenge. This month, July's focus for Bridge and Beyond is in fact squares, through the Give a Square Program. Whatever squares are donated (knitted and crocheted 7-10 inches), need to be put with others squares here and afghans designed. Challenging myself to design and bag 3 ghans from those.

Good luck to all participating in this challenge of self, have fun visiting and encouraging each other. I'm looking forward to meeting and blogging with you all.