I love having Followers, Thank You

Showing posts with label Red Scarf Project. Show all posts
Showing posts with label Red Scarf Project. Show all posts

Sunday, August 21, 2011

Sandy's Sunday Year of Projects, fast week

Week #5 for me Aug 21-27

A much shorter post then most of my YOP posts are, and no pictures today. Though links below to see what projects I'm talking about. I've made good headway since last Sunday (Monday when I made my post); but not 1 single item is yet to go from the YOP Work in Progress List to The Yea it's done list. Chipping away. I'm so enjoying visiting, and learning from some pretty awesome blogs with regard to this challenge.

YOP list:
Cotton Cloth Calendar Challenge (about 50% done with DD's cloths) started cloth 7 which was to be Easter Colors, a basket weave design for March; but you can't see the pattern well, and needles are wrong, and wrong size and ...frogged it. Posted it HERE. Think I'll switch to October since that's closer anyway. April, May, June, July, August, and September done. Need to do Jan, Feb, March, Oct, Nov and Dec.
Cotton Cloths for Bridge and Beyond (haven't started)
Wedding Ghan (about 90% Knitting completed! Ends all tucked in, all strips joined. Have started the border. Wanted to finish this weekend, get it in the laundry and block it; that's not going to happen. Spent to much time outside doing yard work.
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf (planned to take on recent trip; but as I was packing it realized I once again had not included the pattern I was using in the zip lock bag!) Why...probably because I was using the pattern on something else? I have no yet frogged this start---it's a 300 stitch cast on and I'm hoping to be able to determine what I was doing.
Poodle Ghan (had planned to finish this by now, had it packed for mentioned trip....mindless knitting would have been good; but.........needed to remove it from the suitcase to make room for our Martini glasses)
Oddball (Two rows of the border done, so bout 60% finished, waiting on a 2nd one to be delivered so I can mail them at the same time.)
Bridge Ghans (no additional headway)
Red Scarf Project Scarf, posted about it HERE. Though I'm about 65% done with it, looks like with the new regulations for The Red Scarf Project, it won't be donated there, but I will continue to work on it and it will be good for something/someone/charity wise.

Wednesday, August 17, 2011

Wedding Ghan, Scarf round 3, and Easter Cloth

Work in Progress Wed Post (links in sidebar)
This is the start, barely perhaps of the cotton cloth for March (Easter). Several problems right from the get go. The stitch/pattern is called basket rib. Well basket certainly seems appropriate for Easter and the colors sure look like Easter Eggs and Jelly Beans so that part works. However, started this with my Denise Needles which is how I discovered cotton and Denise needles don't play well together. There's no sliding, and do you see a pattern? No sure I do. Sometimes patterns don't show up well with variegated yarns; but perhaps the needle size is to large? Perhaps frogging and starting over with a smaller and metal needle (like I used with the other 6 cloths) is the way to go? This cloth is part of the Cotton Cloth Calendar Challenge for DD.
TaDah! Well yes I know that expression and a drum roll is usually reserved for when a project is completed. However, I feel whew.......finished the knitting the last strip (far right), and am joining using the mattress stitch. Well, this is a scheduled post, so perhaps thats done as you now read this? Anyway...the very last brown square on the last strip gave me fits. I frogged it 4 times. Had issues with right and wrong side, not seeing the brown well etc. So, to actually have the last strip done really thrills me. Once joined will crochet edge/border and laundry and block! Stay tuned. Am thus far pleased, this is the largest knitting project I've done, and I learned several new stitches/patterns in the process so this was a challenge for me.

Anxious to see how much larger it will be after joined, border, and blocked. Currently it measures 43 x 53.
This scarf, started out HERE, as an early start for The Red Scarf Project. For some unknown reason I've gotten bad at not noting what pattern I'm using and or where in the pattern I am when I lay something aside. Needed to put this aside to work on wedding ghan. So, frogged it and started over. Decided I would use the pattern from the faded summer cotton cloth, but after several rows decided it was to open and adjusted. Mentioned here. Well.........as things progressed I could see I wasn't going to have enough yarn. I purchased this red yarn several years ago, and so didn't even attempt to match; but was sick and tired of frogging.......so my new idea....see above. I knitted until I ran out of red and joined purple to do the 2nd half. As you wrap scarf you'll see both colors. Jury's out on how I'll like it or not on completion. I do love the colors together, but no...it's not a gift for a lady in The Red Hat Society. lol The other day I read guidelines for The Red Scarf Project have become more restrictive regarding red, which was not an issue before. I need to read and see if this scarf will work for them or not. If not, will go to another charity.

Monday, August 08, 2011

Running to Catch Up

YOP wk 4 for me (Aug 7-13)

Some progress to report on my YOP list:
Got July finished, and both April and September started for my Cotton Cloth Calendar Challenge. I was traveling (Park City, Utah), so washcloths projects were perfect for the plane trip.

April Showers Cotton ClothThis is a neat pattern, one you might remember from the medium tan blocks in my stripes for the upcoming wedding ghan. It's called little blocks.

July clothApril showers is a cool stitch pattern, one I plan to use again perhaps on a scarf. It's called Chinese Waves. It's working up fast since it's basic garter, is nice and I think a very adaptable pattern. It called for a cast on of 45, but I thought that was too large for a washcloth and cast on 35, trick is to have an odd number for the cast on according to Margaret Radcliffe, designer. Was thrilled to come across this pattern, as I have now started and frogged this green--April Showers Cloth 3 times.....argh, just really didn't like the look of the other patterns I tried.

September, fading summer clothFading summer is sort of an eyelet pattern but with garter and purl stitches, called Reversible Open Rib Washcloth. The pattern called for a cast on of 31. I really like the look of this stitch and plan to use it again also. The nice bonus in making these cotton cloths is trying out new stitches.

Also on the plane finished 2 more blocks on the wedding ghan's last stripe (which were blocks 4 and 5), and was almost finished with the 6th and final block of the last strip when I realized there was a mistake. Somehow I had gotten off with right and wrong side. I either didn't count a row, or I hit my clicker (row counter) twice. Arghhhhhhhhh. Dark brown to hard to see to rip out and get back on track on the plane so laid it aside. Once we reached Park City and got settled in, I again re-did the brown section....And...dang it, the same thing happened. I do find it hard to see, and was apparently not paying enough attention so completely frogged it again. As of the writing of this post, I've restarted this last brown block 3 times. I didn't attempt to do it on the plane ride home and plan to finish it today and begin attaching. Fingers crossed. Taking it slowly to be certain I don't get off again. Only doing it when there are no distractions.

Have updated my YOP list when I realized I'd left something off. I started a scarf for The Red Scarf Project way back and didn't get it on the list. Actually that link shows were I made progress, as it was started before that. However...........I didn't keep the pattern I was using with it, don't remember it, and have no clue where in the process I was. So, though I took it with me for this trip to Park City, I ended up frogging it and starting over.

Red Scarf ProjectI started out with the idea of using the Reversible Open Rib Washcloth pattern, but once I did several repeats decided it was too open for a scarf. Click to enlarge. I think with this wonderful soft Plymouth Yarn (washable wool), the openness is greater than with the cotton in above washcloth? So, after doing several repeats decided to do a section of garter stitch (32 rows which is double the amount of rows 16 used in the pattern stitch), then back to the pattern though only did 1 repeat and was going to repeat that. Changed my mind again and kept going with garter. The little bit of pattern, I think just gives some detail to the scarf. Now my problem is whether or not I have enough yarn. The skein is 200 yards, and this scarf is wider then I sometimes make them. I'll dig out my scale and weigh how much yarn I have left. If there's not enough, will have to get creative with how I finish it, as I've had this yarn a long time and won't even attempt to match it.

YOP list:
Cotton Cloth Calendar Challenge (about 40% done with DD's cloths)
Cotton Cloths for Bridge and Beyond (haven't started)
Wedding Ghan (about 80% done, need to finish last block, attach last strip, edge, launder and block)
Candy Corn Ghan (no headway)
Buckeye Scarf (no headway)
Learn to knit socks (no attempt)
Learn to knit cable stitches (no attempt, but....have found a pseudo stitch I may try on a cotton cloth to get me started)
Awesome wool (blue) scarf (planned to take on recent trip; but as I was packing it realized I once again had not included the pattern I was using in the zip lock bag!) Why...probably because I was using the pattern on something else? I have no yet frogged this start---it's a 300 stitch cast on and I'm hoping to be able to determine what I was doing.
Poodle Ghan (had planned to finish this by now, had it packed for mentioned trip....mindless knitting would have been good; but.........needed to remove it from the suitcase to make room for our Martini glasses)
Oddball (sorry to report no headway since picking out colors and edging pattern)
Bridge Ghans (no additional headway)

Wednesday, April 13, 2011

Working Ahead for The Red Scarf Project

Red Scarf StartA beginning, not the best picture, but you can sorta see the pattern. Actually guess it's more of a texture. This is a nice reversible stitch called checks and ridges. Using Plymouth Encore knitted worsted weight yarn which I love. It's 25% wool and 75% acrylic. It washes and wears very well and has a nice soft feel to it. It will be nice and warm because of the wool, and because this is a nice solid stitch. Using size 9 knitting needles. The red looks a bit more orange here in the picture than it really is. Had this yarn at finger tips and decided I needed a knitting project to give some relief after so much crocheting which is more bothersome on the arthritis etc.

This is working ahead for me as it will go to The Red Scarf Project which isn't due to be mailed until this coming fall. This is a charity I used to do a lot for, but in recent years my list became too large, so it's nice to have worked my way back to this part of my list. The pattern is a 4 row repeat and shows up best on a solid color in my opinion. I also like it because there's 2 rows of good old garter stitch.

I should also add this will be traveling with me to Aruba (be sure and check out my travel blog, will have lots of pictures and info there in the future).

What are you working on?



This was last weeks WIP, but I never got things officially posted, so am using it this week, now that I'm back in town and trying to play catch up. In my effort to play catch up this am before heading to work, I did manage to drop 209 for my EC friends (think I got all of you who dropped in my absence), and a few more. I also managed to visit and comment on 21 of you in the WIP--all that had signed in before my time was up. And now, to work. Keep stitching.

Saturday, September 20, 2008

Scarfin it up






Red Scarfs! The first one is knit with Airy Aunt Bee, so nice and soft. It's the brighter one of the 3. Wish this pictures would load in the order I actually put them in. sigh
The 2 darker reds are both crocheted. The 2nd one I made was with Caron Simply Soft (hate working with that yarn), it's the one pictured on the far right. I do like the texture. Used 2 dc followed by 1 fpdc, continued that pattern throughout. I did not switch to bpdc on the next row, but continued with the fpdc. Added to both ends and around edge with Red Heart, as I ran slightly short. Gave it a bit more substance and a wee bit of shading.
The 3rd scarf, the one pictured in the middle here was my favorite. I did blocks of stitches and really like how they show up with the solid dark red. sc, dc, v-stitches. All 3 were mailed off 2 days ago for The Red Scarf Foundation. Two measured 68 inches, while the 3rd one measured 76 inches long. Widths varied from 6-7.5-8 inches.
Thanks for the good wishes regarding the mess left from Ike, much appreciated. Heading to The Ohio State Football Game shortly, so no more clean up today. We'll hopefully get the rest of it done tomorrow.
Working on the blue and white scarfs now for The Special Olympics. Just finished the 3rd one last night (no pics yet), and hope to get one more done with the yarn I have left.

Sunday, September 07, 2008

Time to Scarf!




One red scarf done, one in the works. Both to be sent to The Red Scarf Project (link on right side of blog). Remember the month of Sept is the ONLY time these scarfs can be sent to The Orphan Foundation of America. The completed scarf was knitted, the one in the works is being crocheted. Look at the close up...I'm really liking the texture. (texture is 2 dc, followed by fpdc, 2dc across...then instead of putting a bpdc in the next row where the pfdc is, I've continued to use fpdc. This is making a nice thick scarf. Hoping to get one more Red one done for this project and get them in mail. Goal to wrap this up this week...fingers crossed.
Then would like to work on some rectangles for HAP, and blue scarfs for The Special Olympics Project...and many other items, but those probably on the top of the list.
Ohio State Football Game yesterday. Yes we beat Ohio University; but we did not play well. Weather was nicer than the previous week in that I didn't feel like I was going to melt from the heat.
Headache, sore throat today...not good, have a very long week ahead at work.
Motto for the week:
Be kind, it makes the world a better place.